What you are scheduling
You book time blocks on orders (method, station cluster, estimated minutes). There is no separate “schedule job” record — it’s always tied to an order.
Warnings use:
Shop daily capacity hours (Settings → Shop floor stations)
Order requested ship date when the day looks impossible
Three views, one purpose
View | Best for |
|---|---|
Calendar | Seeing the month; dragging a block to another day |
Gantt | Looking at this week by decoration method |
Run sheet | A printable day list for the floor |
Shop floor heatmaps use the same capacity numbers — see Production.
Open Schedule
Sign in as staff.
Open Schedule in the left menu.
Choose Calendar, Gantt, or Run sheet.
Confirm machines and due dates on the calendar before the run sheet — last-minute moves hurt packing.